Environmental Law Australia

Greentree case

This case involved an application for an injunction to restrain NSW wheat farmers from clearing a Ramsar wetland. It established important principles for imposing fines for environmental offences done for commercial gain.

The case is an example of responsive regulation, an enforcement model first proposed by Ayres and Braithwaite (1992), in which regulators signal to industry their commitment to escalate their enforcement response whenever lower levels of intervention fail.

In 2002 the Australian Government Department of the Environment and Heritage (DEH) became aware of clearing of the Windella Ramsar site in NSW, part of the Gwydir Ramsar Wetland, listed under the Ramsar Convention in 1999.

DEH inspected the site in late 2002 and found 20% of it cleared. Following the inspection DEH tried to negotiate rehabilitation of the site but did not initiate legal proceedings to prevent further clearing.

A further inspection by DEH in July 2003 found that 100% of the site had been cleared, an area totalling 100 hectares. Legal proceedings were then commenced.

In the first stage of this case, the Commonwealth Minister for the Environment & Heritage sought and was granted an urgent, interim injunction (on an ex parte basis) to restrain the farmers from continuing to contravene section 16 of the contravening the Environment Protection and Biodiversity Conservation Act 1999 (Cth) (EPBC Act) by preparing the site for the planting of a wheat crop.

The farmers then applied to the Court for the interim injunction to be dissolved. Sackville J refused that application and the matter proceeded to trial.

At trial the farmers did not dispute that they had cleared and ploughed an area in preparation for planting a wheat crop but they disputed this contravened the EPBC Act. Their defence was based on three main arguments:

  • the cleared site was not validly designated as a Ramsar Wetland under the EPBC Act;
  • clearing vegetation and growing of wheat on the site was lawful due to section 43A of the EPBC Act, which permitted actions fully approved at the commencement of the Act on 16 July 2000 to proceed without further approval under the Act; and
  • in the alternative, the clearing did not have a significant impact on the Ramsar wetland.

Sackville J dismissed the arguments raised by the farmers and found that they had contravened section 16 of the EPBC Act.

Sackville J granted an injunction restraining the farmer’s activities and requiring them to rehabilitate the wetland. His Honour also awarded pecuniary penalties totalling $450,000 against a company director and the company responsible for the clearing, plus costs.

The farmers appealed against these decisions but the Full Court of the Federal Court dismissed their appeal.

Key documents

(Note particularly the use of satallite images and aerial photographs over time as part of the evidence – this is typical in modern vegetation clearing litigation)

Interlocutory injunction

Trial

Appeal

Significance of decision for penalties

The decisions in this case have subsequently been relied upon by later courts to impose significantly higher fines for illegal tree clearing, see:

References

Ayres I and Braithwaite J, “Responsive Regulation: Transcending the Deregulation Debate” (Oxford University Press, Oxford, 1992).

McGrath C, “Greentree appeal dismissed” (2005) 22 EPLJ 325

Thanks to the Environmental Defenders Office (NSW) for obtaining the court documents.

Media reports about this case

General articles on land clearing:

Scorched country: the destruction of Australia’s native landscape, The Guardian, 7 March 2018.

Death by a thousand cuts: the familiar patterns behind Australia’s land-clearing crisis, The Guardian, 15 March 2018.

Queensland grazier fined $450k for illegal land clearing [on Strathmore Station], ABC News, 6 April 2019.